Allium ‘Globe Master’ brightening the Entry Court at Edenwald!

05.22.2019
These bulbs were planted as part of a Landscape Master Plan completed in the Winter of 2018. Phase 1 was installed in the spring and fall of 2018 and focused on rejuvenation and enhancement of the landscape at the main arrival/drop-off area. Phase 2 of the Landscape Master Plan is currently underway, and includes the removal of several overgrown and storm damaged trees as well as the planting of numerous canopy trees, flowering trees, shrubs and perennials throughout the urban campus. Views of the landscape from the interiors, overall seasonal color and foliage texture interest, as well as easier long term maintenance were critical motivating factors for the redesign.